Facilities Planning, Design and Construction
Contact Us
Room: C-Building, C-350
Phone: (718) 482-5575

Committed to a Safe, Healthy, Clean and Engaging Campus
Facilities Planning, Design and Construction mission: Provide a safe, healthy, clean and engaging campus that facilitates pride, belonging and success among students, faculty, staff and visitors.
We are responsible for ensuring that the master planning, design and construction of the College’s facilities support the academic, research and administrative needs of our students, faculty and staff.
Additionally, our broad range of services include the design and construction of major renovations, campus improvements, and space utilization.
Planning
- Project budget planning and preparation.
- Space planning of short- and long-term projects.
- Coordinating floor plans, campus signage and space inventory updates.
Design
- Architectural and engineering design development.
- Campus-wide ADA compliance, and energy management program.
- Code compliance including review, violation correction and fire protection.
Construction
- Manage and closely supervise campus-wide construction.
- Facilitate Capital Projects with DASNY (Dormitory Authority of the State of New York), CUNY, NYPA (New York Power Authority) and other government agencies.
- Develop and implement technical solutions to unforeseen conditions.
- Ensure all projects adhere to guidelines & regulations to comply with federal, state and city codes.
- Serve as Construction Project Manager for all construction projects to ensure their completion in compliance with design intent and specifications.
The 2,992 glazed terracotta panels beautified the C-Building while making it safer and energy efficient, preventing water leaks and bringing it into compliance with building codes and laws.
The major 21,000 square foot expansion of the College’s library – a 60% increase of the previous space – included doubling its capacity to 732 seats, adding 312 workstations with internet connections, media rooms, 11 new group study rooms, new reading rooms, and much more.
The 10,000-ft2 new space was developed for 10,000 Small Businesses’ trainings, lectures, alumni events, and more. The 10,000 Small Businesses program, a partnership between LaGuardia and Goldman Sachs to support and help local entrepreneurs grow their businesses and create jobs, provides training in business development, capital building, systems management, and more.
C-Building Façade Replacement
The 2,992 glazed terracotta panels beautified the C-Building while making it safer and energy efficient, preventing water leaks and bringing it into compliance with building codes and laws.
Library Phase I Renovation – E Building, Second Floor
The major 21,000 square foot expansion of the College’s library – a 60% increase of the previous space – included doubling its capacity to 732 seats, adding 312 workstations with internet connections, media rooms, 11 new group study rooms, new reading rooms, and much more.
Goldman Sachs 10,000 Small Businesses Education Center at LaGuardia Community College – C Building, Seventh Floor The 10,000-ft2 new space was developed for 10,000 Small Businesses’ trainings, lectures, alumni events, and more. The 10,000 Small Businesses program, a partnership between LaGuardia and Goldman Sachs to support and help local entrepreneurs grow their businesses and create jobs, provides training in business development, capital building, systems management, and more.
Capital Projects* (As of August 25, 2025)
*All renderings shown in this section are representative of the project and not necessarily an accurate depiction of the finished location.
Cohen Career Collective – C-Building, Fifth & Sixth Floors
Status: In design.
Anticipated Project Completion: Early 2029.
Location: C-Building, Fifth and Sixth Floors.
Description: Create a 160,000 square-foot state-of-the-art workforce training center preparing students for high demand jobs and career success.
Elevator Lobby – First Floor and Roof Access
Status: In design.
Anticipated Project Completion: End of 2028.
Location: Building wide.
Description: Building upgrades include:
- Addition of five new elevators — two will provide access to the roof.
- Renovated elevator lobbies.
- Installation of centralized chiller plant.
- New emergency generator.
- Incoming Con Ed electrical reinforcement.
Status: Under construction.
Anticipated Project Completion: End of 2025.
Location: First, Third and Seventh Floors.
Description: Reconstruct existing spaces to relocate and accommodate classrooms and offices affected by upcoming additional elevator project.
Work Space and Open Meeting Place – C Building, Ninth Floor
Status: In design.
Anticipated Project Completion: Early 2027.
Location: C-Building, Ninth Floor.
Description: Collaborative space to programmatically bridge current LaGuardia students with future employment opportunities.
Status: In design.
Anticipated Project Completion: Early 2026.
Location: E-Building, Fifth Floor and Theater.
Description: Replace obsolete roofing system with energy compliant roofing system.
Library Main Entrance – E-Building First Floor
Status: In design.
Anticipated Project Completion: End of 2026.
Location: E-Building, First Floor.
Description: Space renovation and Library HVAC upgrade.
Status: In design.
Anticipated Project Completion: End of 2026.
Location: E-Building, Third Floor
Description: Relocation and renovation of research, biology, chemistry, physics, occupational therapy, and physical therapy labs.
Status: In design.
Anticipated Project Completion: Fall 2026
Location: B-Building
Description: Replace and upgrade HVAC.
College Wide Projects (As of August 25, 2025)
Status: In design.
Anticipated Project Completion: Ongoing.
Location: Campus wide.
Description: Replace and upgrade lighting, electrical, HVAC, and building management systems to comply with energy codes.
Service Request Contact Information
LaGuardia Community College’s maintenance of the physical plant, both inside and out, is divided among several departments. Following is a list of services with the correct department or area noted with their contact information.
Facilities Planning, Design and Construction Phone: (718) 482-5575 |
|
| |
Administrative Support Services Phone: (718) 482-5561 For the following services, use “Request Support” in the Faculty and Staff Portal.
|
|
Public Safety |
|
Active Campus Changes
Please excuse our appearance, we are making improvements in the following areas.
Construction
- C Building: First Floor – Next to Admissions
- C Building: Third Floor – Next to Cafeteria
- C Building: Seventh Floor – West Side of Building
Lighting Upgrades
- College Wide: C, E and M Buildings
Department Contacts
Name | Contact Information |
---|---|
Ruben Mercier Director, Facilities Planning, Design and Construction | rmercier@lagcc.cuny.edu Phone: (718) 482-5612 |
Frederick Lin Office Assistant | flin@lagcc.cuny.edu Phone: (718) 482-5575 |
Vasso Kampiti Project Manager | Vasso.Kampiti@lagcc.cuny.edu Phone: (718) 482-5980 |
Marcello Garzon Assistant Project Coordinator | edison.garzon80@lagcc.cuny.edu Phone: (718) 482-5572 |