    Construction on the Library Expansion project continues to progress; earlier this month we welcomed NYC Councilman Jimmy Van Bramer to tour the 2nd floor construction site in a visit that was covered by NY1.

    The 2-story structural columns were reinforced, allowing the opening of the concrete slab between the first and second floors to begin. Installation of electrical wiring, IT and architectural finishes continues. HVAC and fire protection systems are substantially complete.

    The Division of Administration is committed to keeping the College community informed and safe for the duration of this project. Please don’t hesitate call our 24/7 - hotline number, 718-349-4100, with concerns or questions.

    Press Release

    City Council Majority Leader Jimmy Van Bramer Kicks Off LaGuardia Community College Library Renovation

    Officials Get Behind-the-Scenes Look at Improvements to LaGuardia College

    The Library Expansion project is a $13 million project, not a $2 million project, as NY1 reported. 

  •  2015 Past Updates

    December 2015

    The library will be closed for renovation work from December 18, 2015 - January 3, 2016

    • During this time, books may be returned to E111, the Library Annex, Books requested before Monday, December 21, 2015 from other CUNY schools can be picked up in E111
    • The Library Annex will be open:
      Friday, December 18, 2015: 9 a.m. - 5 p.m.
      Monday-Wednesday, December 21-23, 2015: 9 a.m. - 4:30 p.m.
      Monday-Wednesday, December 28-30, 2015: 9 a.m. - 4:30 p.m.
    • If you need research help, email the Library, or use the Research Chat button on the Library website.
    • You can also request books from other CUNY colleges using your LaGuardia student ID. Books requested from other Libraries will be available beginning January, 2016

    October 2015

    Library staff toured the second floor work-space, getting a glimpse of where such amenities as the media rooms and group study rooms will be situated. Perimeter walls that divide offices and ventilation duct-work have been completed. HVAC units will be installed beginning in November. The new mechanical systems are in place and bathrooms are ready to be re-tiled. A mock up version of the new large windows has been installed overlooking Van Dam Avenue where the future media room will be located.

    August 2015

    The Library will be closed Friday August 7th - Sunday August 23rd to accelerate the completion of the Library Renovation. During this time limited Library services will be available in the E111 Library Annex: 

    • Reference Librarians will be available to work with you and assist with information needs
    • Interlibrary Loan items and books from other CUNY schools can be picked up and dropped off
    • Books already checked out can be returned

    April 2015

    • The demolition of walls and building system components within the new library space on the second floor of the E Building are substantially complete.  Demolition debris have been sorted and carted offsite. Contractors are performing mechanical, plumbing and electrical work on the Library first floor and lobby near the E Building Entrance in order to re-route and/or install new piping, ductwork and wiring as required by the project. 
    • Preparations are underway to provide structural support around the perimeter of the future new opening that will link first and second floors.  The actual cutting of the concrete floor opening is planned for summer 2015. 

    February 2015

    • The Library Annex in room E 111 is now open! The Library Annex provides students with research and information services, extra seating, and access to a small bank of computers. You will also be able to connect your wireless devices.
      Library Annex Hours:
      Monday- Thursday 9:00 a.m. - 7:00 p.m.
      Friday 9:00 a.m. - 5:00 p.m

    January 2015

     2014 Past Updates

    December 2014

    • President Mellow and Vice President Erfan welcomed City Council Majority Leader Jimmy Van Bramer and CUNY Interim Vice Chancellor for Facilities Planning, Construction and Management Judith Bergtraum on December 5, 2014 for the groundbreaking. Read more
    • Elevator access to the E Building second floor is limited to the elevator nearest to the Van Dam St. entrance (opposite E 111).

    November 2014

    • All books located in the stacks are packed and moved to the C Building; students can access these books by request.
    • Most of the computers available to students in the Library are relocated into the Media Lab to remain accessible and accommodate construction.